{"id":2405,"date":"2023-03-11T03:14:27","date_gmt":"2023-03-11T03:14:27","guid":{"rendered":"https:\/\/thanhanicc.com.vn\/en\/?p=2405"},"modified":"2023-03-11T03:40:19","modified_gmt":"2023-03-11T03:40:19","slug":"thanh-an-icc-solemnly-held-the-groundbreaking-ceremony-of-pim-vina-factory-project","status":"publish","type":"post","link":"https:\/\/thanhanicc.com.vn\/en\/thanh-an-icc-solemnly-held-the-groundbreaking-ceremony-of-pim-vina-factory-project\/","title":{"rendered":"Thanh An ICC SOLEMLY HELD THE GROUNDBREAKING CEREMONY OF PIM VINA PROJECT"},"content":{"rendered":"<table style=\"border-collapse: collapse;width: 100%\">\n<tbody>\n<tr>\n<td style=\"width: 50%;text-align: justify\" colspan=\"2\"><span style=\"font-family: 'times new roman', times, serif;font-size: 120%\">On the morning of March 17, 2022, <a href=\"https:\/\/thanhanicc.com.vn\/en\">Thanh An Investment and Construction Company Limited (Thanh An ICC)<\/a> solemnly held the Groundbreaking Ceremony to start the construction of PIM VINA factory at My Trung Industrial Park, My Loc District, Nam Dinh.<\/span><br \/>\n<span style=\"font-family: 'times new roman', times, serif;font-size: 120%\">Attending the Groundbreaking Ceremony, Thanh An ICC was honored to welcome Mr. DO SUNG HEE, Director of Pim Vina Co., Ltd. and representatives of related departments. On the side of Thanh An Investment and Construction Co., Ltd. there were Mr. Vu Kim Phuong-Director, Mr. Nguyen Truong Tam-CEO and staffs of functional departments of the company.<\/span><br \/>\n<span style=\"font-family: 'times new roman', times, serif;font-size: 120%\">Speaking at the Groundbreaking Ceremony, General Director of Pim Vina Co., Ltd., Mr. DO SUNG HEE highly appreciated the efforts of Thanh An Investment and Construction Co., Ltd during the past time. Respond and handle project related issues in a timely manner. He also hoped that, with the capacity and experience in construction of industrial projects across the country in the past time, Thanh An ICC would well perform the construction and complete the project as planned by the leaders of the two sides.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 50%\"><img loading=\"lazy\" class=\"alignnone size-medium wp-image-2356\" src=\"https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-6-533x400.jpg\" alt=\"\" width=\"533\" height=\"400\" srcset=\"https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-6-533x400.jpg 533w, https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-6-1067x800.jpg 1067w, https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-6-768x576.jpg 768w, https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-6-1536x1152.jpg 1536w, https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-6.jpg 1920w\" sizes=\"(max-width: 533px) 100vw, 533px\" \/><\/td>\n<td style=\"width: 50%\"><img loading=\"lazy\" class=\"alignnone size-medium wp-image-2355\" src=\"https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-4-1-533x400.jpg\" alt=\"\" width=\"533\" height=\"400\" srcset=\"https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-4-1-533x400.jpg 533w, https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-4-1-1067x800.jpg 1067w, https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-4-1-768x576.jpg 768w, https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-4-1-1536x1152.jpg 1536w, https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-4-1.jpg 1780w\" sizes=\"(max-width: 533px) 100vw, 533px\" \/><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 50%;text-align: justify\" colspan=\"2\"><span style=\"font-family: 'times new roman', times, serif;font-size: 120%\">On behalf of Thanh An Investment and Construction Co., Ltd., Mr. Nguyen Truong Tam, Managing Director of <a href=\"https:\/\/thanhanicc.com.vn\/\">Thanh An ICC<\/a> has committed in front of all leaders of Pim Vina Co., Ltd. to complete the construction of the project. on schedule, ensuring quality, aesthetics, contributing to building Nam Dinh homeland in particular and Vietnam in general more and more prosperous.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 50%\"><img loading=\"lazy\" class=\"alignnone size-medium wp-image-2353\" src=\"https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-2-1-552x400.jpg\" alt=\"\" width=\"552\" height=\"400\" srcset=\"https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-2-1-552x400.jpg 552w, https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-2-1-1105x800.jpg 1105w, https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-2-1-768x556.jpg 768w, https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-2-1-1536x1112.jpg 1536w, https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-2-1.jpg 1831w\" sizes=\"(max-width: 552px) 100vw, 552px\" \/><\/td>\n<td style=\"width: 50%\"><img loading=\"lazy\" class=\"alignnone size-medium wp-image-2352\" src=\"https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-1-1-533x400.jpg\" alt=\"\" width=\"533\" height=\"400\" srcset=\"https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-1-1-533x400.jpg 533w, https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-1-1-1067x800.jpg 1067w, https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-1-1-768x576.jpg 768w, https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-1-1-1536x1152.jpg 1536w, https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-1-1.jpg 1920w\" sizes=\"(max-width: 533px) 100vw, 533px\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>On the morning of March 17, 2022, Thanh An Investment and Construction Company Limited (Thanh An ICC) solemnly held the Groundbreaking Ceremony to start the construction of PIM VINA factory at My Trung Industrial Park, My Loc District, Nam Dinh. Attending the Groundbreaking Ceremony, Thanh An ICC was honored to welcome Mr. DO SUNG HEE, [&#8230;]\n","protected":false},"author":5,"featured_media":2356,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[164,162,163],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v14.0.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Thanh An ICC SOLEMLY HELD THE GROUNDBREAKING CEREMONY OF PIM VINA PROJECT - Thanhanicc<\/title>\n<meta name=\"robots\" content=\"index, follow\" \/>\n<meta name=\"googlebot\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta name=\"bingbot\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/thanhanicc.com.vn\/en\/thanh-an-icc-solemnly-held-the-groundbreaking-ceremony-of-pim-vina-factory-project\/\" \/>\n<meta property=\"og:locale\" content=\"vi_VN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Thanh An ICC SOLEMLY HELD THE GROUNDBREAKING CEREMONY OF PIM VINA PROJECT - Thanhanicc\" \/>\n<meta property=\"og:description\" content=\"On the morning of March 17, 2022, Thanh An Investment and Construction Company Limited (Thanh An ICC) solemnly held the Groundbreaking Ceremony to start the construction of PIM VINA factory at My Trung Industrial Park, My Loc District, Nam Dinh. Attending the Groundbreaking Ceremony, Thanh An ICC was honored to welcome Mr. DO SUNG HEE, [...]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/thanhanicc.com.vn\/en\/thanh-an-icc-solemnly-held-the-groundbreaking-ceremony-of-pim-vina-factory-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Thanhanicc\" \/>\n<meta property=\"article:published_time\" content=\"2023-03-11T03:14:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-03-11T03:40:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-6.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/thanhanicc.com.vn\/en\/#website\",\"url\":\"https:\/\/thanhanicc.com.vn\/en\/\",\"name\":\"Thanhanicc\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"https:\/\/thanhanicc.com.vn\/en\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"vi\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/thanhanicc.com.vn\/en\/thanh-an-icc-solemnly-held-the-groundbreaking-ceremony-of-pim-vina-factory-project\/#primaryimage\",\"inLanguage\":\"vi\",\"url\":\"https:\/\/thanhanicc.com.vn\/en\/wp-content\/uploads\/2023\/03\/THANH-AN-PIM-VINA-6.jpg\",\"width\":1920,\"height\":1440},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/thanhanicc.com.vn\/en\/thanh-an-icc-solemnly-held-the-groundbreaking-ceremony-of-pim-vina-factory-project\/#webpage\",\"url\":\"https:\/\/thanhanicc.com.vn\/en\/thanh-an-icc-solemnly-held-the-groundbreaking-ceremony-of-pim-vina-factory-project\/\",\"name\":\"Thanh An ICC SOLEMLY HELD THE GROUNDBREAKING CEREMONY OF PIM VINA PROJECT - Thanhanicc\",\"isPartOf\":{\"@id\":\"https:\/\/thanhanicc.com.vn\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/thanhanicc.com.vn\/en\/thanh-an-icc-solemnly-held-the-groundbreaking-ceremony-of-pim-vina-factory-project\/#primaryimage\"},\"datePublished\":\"2023-03-11T03:14:27+00:00\",\"dateModified\":\"2023-03-11T03:40:19+00:00\",\"author\":{\"@id\":\"https:\/\/thanhanicc.com.vn\/en\/#\/schema\/person\/3f772c991ece56cc93e192d42f40fdd1\"},\"breadcrumb\":{\"@id\":\"https:\/\/thanhanicc.com.vn\/en\/thanh-an-icc-solemnly-held-the-groundbreaking-ceremony-of-pim-vina-factory-project\/#breadcrumb\"},\"inLanguage\":\"vi\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/thanhanicc.com.vn\/en\/thanh-an-icc-solemnly-held-the-groundbreaking-ceremony-of-pim-vina-factory-project\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/thanhanicc.com.vn\/en\/thanh-an-icc-solemnly-held-the-groundbreaking-ceremony-of-pim-vina-factory-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"item\":{\"@type\":\"WebPage\",\"@id\":\"https:\/\/thanhanicc.com.vn\/en\/\",\"url\":\"https:\/\/thanhanicc.com.vn\/en\/\",\"name\":\"Trang ch\\u1ee7\"}},{\"@type\":\"ListItem\",\"position\":2,\"item\":{\"@type\":\"WebPage\",\"@id\":\"https:\/\/thanhanicc.com.vn\/en\/thanh-an-icc-solemnly-held-the-groundbreaking-ceremony-of-pim-vina-factory-project\/\",\"url\":\"https:\/\/thanhanicc.com.vn\/en\/thanh-an-icc-solemnly-held-the-groundbreaking-ceremony-of-pim-vina-factory-project\/\",\"name\":\"Thanh An ICC SOLEMLY HELD THE GROUNDBREAKING CEREMONY OF PIM VINA PROJECT\"}}]},{\"@type\":[\"Person\"],\"@id\":\"https:\/\/thanhanicc.com.vn\/en\/#\/schema\/person\/3f772c991ece56cc93e192d42f40fdd1\",\"name\":\"ho\\u00e0ng ho\\u00e0ng\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/thanhanicc.com.vn\/en\/#personlogo\",\"inLanguage\":\"vi\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/26605c7aa0aad12bd9ac5f9fdbf60e37?s=96&d=mm&r=g\",\"caption\":\"ho\\u00e0ng ho\\u00e0ng\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","_links":{"self":[{"href":"https:\/\/thanhanicc.com.vn\/en\/wp-json\/wp\/v2\/posts\/2405"}],"collection":[{"href":"https:\/\/thanhanicc.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thanhanicc.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thanhanicc.com.vn\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/thanhanicc.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2405"}],"version-history":[{"count":4,"href":"https:\/\/thanhanicc.com.vn\/en\/wp-json\/wp\/v2\/posts\/2405\/revisions"}],"predecessor-version":[{"id":2411,"href":"https:\/\/thanhanicc.com.vn\/en\/wp-json\/wp\/v2\/posts\/2405\/revisions\/2411"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thanhanicc.com.vn\/en\/wp-json\/wp\/v2\/media\/2356"}],"wp:attachment":[{"href":"https:\/\/thanhanicc.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2405"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thanhanicc.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2405"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thanhanicc.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2405"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}